Data Centersat Light Speed

Less waiting. More megawatts.

Get a quote

Manufacturing
end to end.

We manufacture and supply critical equipment for data center and energy builders. Every order is built to your specification and tested before it ships, and we handle delivery to your site.

Explore manufacturing

From specification to site.And into service.

  • Three high-voltage substation units with orange housings and ribbed insulators in evening light.

    01Specify & manufacture

    Share your specifications, quantities, and target date. We manufacture each order to spec, with operations worldwide.

  • Gantry cranes and stacked shipping containers at a port under a dark sky.

    02Inspect & deliver

    We coordinate factory testing, documentation, freight, customs, and delivery to your site, tracked so you never chase a shipment.

  • Gloved hands holding test probes against contactors inside an electrical control panel.

    03Support in service

    We arrange maintenance, repairs, and replacement parts through qualified service partners, with one point of contact.

The capacity behindevery order.

Partner plants in our manufacturing base
40+
Of data center and energy projects equipped by our manufacturing base
10+ gigawatts

We supply every order directly. Each one is built where it gets the best technical fit, availability, and delivered cost, and we stay accountable for it through delivery.

The software behindour operations.

We built AI agents to run our own orders. Your team can license them to read email, schedules, and purchasing records, flag what changed, and draft the next step for your approval.

See the software in action

Works in your existing tools, with your team approving every step.

Equipment schedule

PackageDeliveryInstallation
SwitchgearConfirmedScheduled
Cooling plantUpdate requiredSequence under review
RacksConfirmedScheduled

DocumentRevision 02

Cooling package

Technical submittal

  • Electrical requirements
  • Connection details

Purchasing record

Equipment purchase

Item
Cooling package
Required-on-site date
Per schedule
Supplier documentation
On file

Project team

  • Site leadDoes the delivery change affect installation?

  • Project engineerWhich document is the current revision?

Applied Kinetics

Shared operational context

Change identified
Cooling equipment timing updated.
Impact connected
Installation sequence needs review.
Next work prepared
Coordination brief ready for your team.

Your team approves the next step.

Plan before
you build.

From site selection to concept design. Our AI-powered services help you find offtakers, compare operating partners, evaluate land, and plan your next data center development.

Explore AI infrastructure

What’s holding up your build?

Bring us your equipment list, delivery location, and target date. We’ll work out how to build it and get it to your site.

Get a quote